resume2009
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
Seeking a position that will offer growth using of my well-developed technical and academic skills.
Professional Experience
ep 2002 until now: working as a petroleum engineer in POGC (Pars Oil & Gas Company). My work experience included:
Involved in Drilling and Completion Operation In southpars field on SAGA1&2 Japanese Drilling rigs, involved in Monobore Cemented completion project which is applied for the first time in Middle East.
Surface, process and Subsurface Production engineering (revamping and modifying plan to increase capacity of offshore plant ΈAssalouye)
Involved in PSP (PLT: production logging tools by SLB CO.) project in phases 2&3 offshore.
Well performance analysis: Driving IPR&WHPC curves & Nodal Analysis, DHFP (Down Hole Flowing Pressure) calculations, Applying HYSYS software to simulate well head test separator and well production allocation based on well flowing pressures.
Member of start up team on south pars phase one wellhead platforms, planning & performing well test campaign in well head test separator for all wells to optimize well productions.
Produced Water sources analysis for gas-condensate wells in south pars gas.
Supervision on pressure-temperature survey for wells of phases 1&2&3 (14 wells) in south pars gas-condensate field that done by ALMANSOORY CO.
Site supervisor during the perforation (CCL, and correlation), clean-up and well test with SCHLUMBERGER.
Wellhead, wire line services and work over supervision.
Involved in coiled tubing operation.
Familiar with operating & repairing of hydraulic and manual surface and subsurface safety valves (wireline and tubing retrievable types). And modifying return oil lines for hydraulic valves to prevent wasting hydraulic oil.
Repairing actuators of hydraulic surface safety valves(CAMERON TYPE 15000 PSI)
Wellhead & X-mass Tree pressure integrity test.
Familiar with different completion equipments such as: Packers, Liner hangers, SSSV, gas lift valves, submersible pumps (REDA), PSI unit (pressure-temperature units in down holes), SSD, and other usual equipments.
Writing and preparing indent for well equipments & spare parts that will be needed in future.
Eductation
Master of Energy and Environmental Management: Eni Corporate University-Milan-ITALY - graduated in jun 2007
Final project: assessment of lean profile in well drilling technology by ENI and comparison by conventional drilling methods in terms of environmental impacts and cost analysis.
Bachelor of Engineering in Petroleum: Petroleum University of Technology, Ahwaz, Iran-graduated in 2002 with honours.
Final Project: calcium sulfate scaling during water injection and the effect on permeability in porous media published in SPE by Dr. Moghadasi
Advisor: Dr. Moghadasi & Co-Advisor: Dr Jamiolahmadi
Certification
-UBD (under balance drilling) by NAFTCAVE COMPANY
-H.U.E.T (Simulated Helicopter Underwater Escape Training Course)
-STCW (Standard of Training, Certification and Watch keeping for seafarers)
-H2S safety and Medic First Aid.
Additional Information
un 2006 up to Jun 2007 student in master degree of energy and environment management in Eni corporate university: concerning business management in the energy and environment sector and assessment the impact of energy and environmental policies on business and management.
Jun 2005 2 weeks training course in research centre of petroleum industry about hydrate formation& phase behavior of hydrocarbons and HYSYS Software
December 2004 6 weeks in NISOC to be familiar with well testing, well logging, well planning
September 2004 H.U.E.T (Simulated Helicopter Underwater Escape Training)Course in Mahmoudabad Technical and Engineering Complex
September 2003 1 week course by NAFTCAV CO. about U.B.D(under balance drilling)
December 2001 6 months OJT(ON JOB TRAINING) in kish island and offshore drilling rigs SAGA1&2 running liner, cement job, running completion, installing X-MASS TREE, perforation, stimulation, and clean up
Hot Categories
Chemicals
Batteries