OIL&GAS OFFSHORE INSTALLATION METHOD ENGINEER
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
Pipeline, Spool, Riser, Riser Guard, Installation Aids, Shore Approach, Engineering & Fabrication, Oil & Gas
Barges: S230, Castoro II, S355, Crawler, S3000.
Yards: Alexandria (Egypt), BOSCONGO, SCNL Port Harcourt Nigeria
Professional Experience
2008 / Now Offshore Installation Method Engineer, SAIPEM S.A. Company, Paris, Angola, Congo, Nigeria
Writing of all the necessary procedures for pipelines, risers, spools and pipeline crossings installation and calculation notes for project implementation. Technical assistance and operation follow up on board installation vessels
Fabrication follow up of spools, risers, installation aids and subsea structures including material provisioning, consumable, welding, Non Destructive Testing (NDT), painting/coating, dimensional check, hydrotest, lifting and loading for offshore transportation in accordance with client specifications and deadlines (fabrication yard & offshore)
Definition of riggings for pipeline laying and subsea structures lifting
Barge mooring pattern analysis particularly in congested areas and close to offshore structures
Taking part in offshore work preparations and operations
Identifying technical problems and making the necessary technical decisions in compliance with contractual and HSE requirements
Coordination of the interfaces between Methods activities and Engineering Departments, Marine Operation, assets and yards
Dealing with diving department and writing of diving procedures for subsea work such as spools, risers and subsea structures installation in accordance with IMCA rules
Writing of diving procedure for riser and spool metrology
Diver safe umbilical length calculation in case of DP installation vessel in accordance with IMCA rules
HAZID for diving activities
Dealing with pre-commissioning department for installation aids for pipeline laying such as initiation/laydown heads, pig launcher/receiver
Eductation
2001 SQL and DB2 Database, Computer Associate, Paris, France
2000 IBM Mainframe Analyst Programmer, AFPA, Marseille, France
1999 / 2000 Consultant metier, Engineer Superior School of Marseille, France
1998 AutoCAD intensive training, CAD Formation (Autodesk certified organization), Marseille, France
1996 / 1997 Preparation of « Agrιgation » (highest teaching diploma in France) in Mechanics and Manufacturing, Mechanical Institute of Marseille, France
1996 Master degree, Fluid Mechanics and Structures, Mechanical Institute of Marseille, France
Hot Categories
Chemicals
Batteries