Power engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
errection, commisioning, operation, maintenance of power plant
Professional Experience
A competent professional with over 2 years of experience in Operation & Maintenance, Erection & Commissioning and Plant Operations. Presently associated with Manikgarh Cement as Deputy Manager – Mechanical Maintenance & Operation. Experience in Group distribution test of ESP, Air leakage test of air heater and Hydraulic Test of BFP control valves. Expertise in maintenance & troubleshooting of Condenser & Ejectors, Pump & Gearbox, etc. Resourceful at strategizing techniques for maximum utilization of manpower / machinery. Skilful in enhancing systems to bring greater cost efficiency levels & energy/ power reductions. Excellent analytical, troubleshooting and inter-personal skills with proven ability in driving quality enhancement, process improvement and cost savings initiatives during the career span.
Eductation
�[Graduation in Power Plant Engineering from National Power Training Institute, Nagpur with 64.54% marks in 2006.
Certification
Training
Organisation : Tata Power Company Ltd., Jamshedpur
Duration : One month
Description : Gone through the study of power plant familiarisation.
Organisation : NPTI, Nagpur (which is an exact replica of Khaperkheda Thermal Power Station)
Description : Undergone the Simulator Training on Fossil Fuel Fired Power Plant based Control Room Simulator and pulverized the Fuel Fired Boiler & KWU Steam Turbine
Additional Information
�[ Handled the operations of the 15MW Manikgarh Captive Power Plant.
�[ Oversaw the operation and maintenance of wide range of Mechanical systems and equipments:
– Boiler : Two boilers – 37 tph each, AFBC type-Bi drum, Natural Circulation, Charcoal firing boiler (make - Cethar vessel).
– Turbine : Three Turbines
1. BHEL – 10MW, rpm - 8000, gear box- Triveni Engg Ratio -5.34.
2. Skoda Turbine – 5MW, Axial flow, 47 stage Steam Turbine
3. Stall TURBINE – 5MW (stand by), Radial flow. Condensing type
– Generator: BHEL output rating – 12500KVA
�[ Gained exposure in commissioning of various Mechanical instruments & machines like Air Receiver, Ejectors, ESP, Air Heater, etc.
�[ Ensured compliance of various quality standards for ISO 9001 & ISO 14001.
�[ Introduced Fly ash draining arrangement in ESP hopper.
�[ Separated the instrument air line from service air line.
�[ Provided suggestions to the HOD to arrange meeting during any breakdown in the shift with the Shift Incharge and Shift Fitter.
�[ Received appreciation from DGM about fly ash draining system providing work in ESP hopper.
Hot Categories
Chemicals
Batteries