A Young and Dynamic Mechanical Engineer with overall More than Eleven years in-depth experience in the Oil & Gas, Nuclear Power and Pipeline, piping,
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
Maintain the QMS in place
Professional Experience
PROFESSIONAL EXPERIENCE
1.Cairn Energy India Ltd.
A)Project Undertaken: 03rd March 12 to at present (Brunel Energy)
Lead QA QC Engineer(Team Size-14 ABS Inspector)
Bhogat Terminal Project
B)Project Undertaken: QA QC Engineer (Team Size – 7 ABS Inspector)
Bhagyam Trunk Pipe Line project (Construction, installation, testing, pre-commissioning and commissioning of the 24” production fluid pipeline, 24” water injection pipeline, 8” HDPE pipeline, SEHMS including tie-in to the facility at the Well Pad 15 & MPT). (Contractor: Punjlloyd & TPI: ABS inspection)
C)Project Undertaken:16th June 2008 to 11th September 2010
Welding Inspector
•Storage Terminal at Viramgam near Ahmedabad. (Contractor: Indian Oil tanking Ltd).
2. RELIANCE ENGG. ASSOSIATE LTD.Jan 2007 – June 2008
Welding Engineer Projects Undertaken: - East – West Gas pipeline from Kakinada to Bharuch (48” dia line, working pressure 98 bar and test pressure 130 bar) project. (Contractor: China Petroleum Pipeline Bureau).
3. INDIAN OILTANKING LTD. April 2006 – Jan 2007 QA QC ENGG
Projects Undertaken:• Composite work for Siliguri Marketing Terminal of M/s NRL (Tankages & Piping works).
4. AVASARALA AUTOMATION LTD.Sept 2005 – April 2006 QA QC ENGG
Project Undertaken:Handling, Installation, Alignment of End-shield Calandria Assembly, CS Liner FM Vault, CV Top Hatch Beam & Associated components, Reactivity Mechanism & Coolant channel installation in RAPP-6.
5. L & T, HED Oct 2004 – Aug 2005 (10 month contract)QA QC ENGG
Project Undertaken:Handling, Installation, Alignment of End-shield Calandria Assembly, CS Liner FM Vault, CV Top Hatch Beam & Associated components, Reactivity Mechanism & Coolant channel installation in RAPP-5.
6. D K INDUSTRIAL SERVICES April 2004 – Sept 2004 (6 month contract)
RT INTERPRATOR
7. Isotope Teknica Ltd Dec 2002 – Mar 2004 (18 month Contract)
Site In charge
8. TECHNO ENGINEERS Sep 2001 – Dec 2002 (16 Month Contract)
Trainee Engineer NDT
Eductation
• Diploma in Mechanical Engineering from Board of technical Education, Jodhpur in the year 2001.
• MBA from ICFAI (Distance Learning Program) under study.
Certification
CWI (Certified Welding Inspector) from American Welding Society (AWS) in 2006.Valid up to Dec 2015.
• ASNT LEVEL II in RT, UT, MPT & LPT and BARC level-II in RT.
Additional Information
• HSE Award March 2011 – Proactive HSE behaviours in MDPL project.
• HSE Champions – Nov 2011 - Certificate of Appreciation for the commendable work in BTPL project for proactively reporting the unsafe conditions & upholding the CIL HSE standards.
• Pat on Back Award Nov 2011 – instrumental to keep the repair rate for the pipeline below 4% by way of continuous monitoring & training to welders. A substantial role not only in QA/QC but execution also and contributed lot in timely completion of the project.
Hot Categories
Chemicals
Batteries