| Reference | LT12100800 |
| Date | 1/16/2012 |
| Location | Middle East |
| Scope | The objective of the Project is to upgrade and expand the existing STP in Dukhan to meet the future demand for sewage treatment. The project is to provide a design of high integrity and reliability and provide an optimized system that meets all effluent discharge requirements and other criteria as identified in this document. QP seeks a robust reliable treatment system for the STP and associated facilities suitable for a design period of 2022. |
| Bid Bond | QAR 100,000.00 |
| Bond Validity | 150 days |
| Offer Validity | 120 days |
| Documents Price | QAR 200.00 |