| Reference | 24-2011 |
| Date | 6/1/2011 |
| Location | Middle East |
| Scope | Supply, install, adjust, calibrate , operate and pre commissioning, commissioning /6/ six complete control panels including vibration & displacement monitroing system to: ( start , stop , operate , protect from abnormal conditions, monitoring all unit parameters ....) for main gas compressor units (creusot-loire low & high pressure 12301a, b, c&12302a, b, c) instead of the existed control panels (based on turn key job). Each unit consists of: electric motor, gear box and compressor. |
| Bid Bond | Euro 135000 |
| Offer Validity | 180 days |
| Documents Price | Euro 20 |