| Reference | BID902692 |
| Date | 12/8/2013 |
| Location | Africa |
| Scope | Installation of Substation –XX Electrical Distribution System: The scope of this work is to replace and renew 13.8kv and 5kv switchgear panels with transferring all old power cables, remote control cables from Substation x to the new Substation xx ,and that according to approved international standards codes and safety rules regulations without any power failures. |
| Bid Bond | 0.5% |
| Documents Price | 1,000 (Libyan Dinars) |