| Reference | LT13112800 |
| Date | 12/26/2013 |
| Location | Middle East |
| Scope | The objective of this project is to carry out Front End Engineering Design (FEED) services and prepare a scope of work for EPIC Contractor to install another Gas Pre-heater, which will operate parallel to the existing Regeneration Gas Pre-heater E-9404 and subsequently increasing the reliability of the plant. Note: Following the completion of techno-economic feasibility study, QP established that there is a requirement to install new Gas Pre-Heater similar to existing Gas Pre-Heater E-9404 |
| Bid Bond | QAR 80,000.00 |
| Bond Validity | 150 days |
| Offer Validity | 120 days |
| Documents Price | QAR 200.00 |