Scope |
The company invites all prospective suppliers and contractors for EPIC for Replacement of Produced Water Flash Drum.
The prime project objective is to install a new Produced Water Flash Drum and its associated equipment to handle the increased inflow of produced water generated in Recycle Gas (RG) plant at Dukhan. The flow of produced water at the Gas Recycling plant in Dukhan has increased significantly. The existing Produced Water Flash Drum (V-9707) cannot handle this increase in flow. So it has been suggested to replace existing V-9707 with a bigger vessel V-9707 (N). The purpose of this project is to replace V-9707 with a bigger vessel V-9707 (N) and install its associated equipment.
|