Egypt Zones accountACCOUNT
EPIC for Portable Water Network Upgrade at Dukhan JFT to FNDS
Engineering Procurement and Construction (EPC)
Reference GT25107000
Date 7/6/2025
Location Middle East
Scope The company invites all prospective suppliers and contractors for EPIC for Portable Water Network Upgrade at Dukhan JFT to FNDS.

Brief Summary of Scope of Services. The objective of the EPIC related SERVICES for implementation of the proposed facility/ facilities (construction and demolition scope) to ensure uninterrupted water supply to DCA consumers. Brief scope as listed below. a. Replacement of Existing Potable Water Pipelines (8", 4" and branch lines) ",,Replace existing 8" (from DDP to FNDS) and 4" (from DDP to Beach house) pipelines with new integrated pipeline of suitable size supplying potable water to all existing consumers connected with 8" and 4" pipelines. The New pipeline shall be routed from DDP to FNDS via DWS, Beach house and DSFA. ",,Disinfectant Injection facility will be provided (if required) to meet potable water quality standards. ",,The new/replacement branch lines (sizes from 2" to 6") shall be connected to the relevant consumers. b. New DM (Demineralized) Water Plant ",,DM water plant (including local control panel) having design capacity of 2 m3/hr (to be re-confirmed during FEED) is required to meet the DM water demand of DCA consumers. Along with DM water package, DM water package feed pumps, DM water storage tank, DM water tanker filling pumps and tanker filling station are also required. c. New Concrete Tank at DSFA ",,A new concrete tank having 200 m3 storage capacity is required at DSFA for enhancement of potable water central storage capacity from 150 m3 (existing concrete tank) to 350 m3 for ensuring two days storage capacity considering average potable water consumption of approximately 175 m3/day. Upgrade of potable water storage system is required at DSFA (including possible upgrade of pumping facility) to address any unforeseen scenario (pipeline leakage and maintenance, which may take up to 2 days) and ensure interrupted supply to potable water users at DSFA. d. New line to existing irrigation water tanks (3 numbers) from the new pipeline ",,Three number of existing irrigation water tanks (IRT-SFA-76, IRT-R11-77 & IRT-R11-78) to be connected to the new potable water distribution header along with required instrumentation for flow control, level control/tank filling shall be required for this purpose. e. Demolition (8", 4" and branch lines) ",,Demolition of existing pipelines (8" and 4" headers & branch lines) is required after successful commissioning of new facility. Demolition of following existing potable water pipelines (including demolition of pipelines, supports, associated civil works, earthworks, and all existing related facilities) shall be performed under this project.

Bidding Information

Bid Bond QR 800,000.00
Bond Validity 150 days
Offer Validity 120 days
Documents Price QR 500.00
Engineering Procurement and Construction (EPC)
Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works Civil Works - General Construction Contractors Electrical Engineering Procurement and Construction (EPC) General Installations for water/waste water plants Mechanical Pipe Lines Installations Pumping Stations Steel Works
Related Tenders: Civil Works Civil Works - Finishing works Construction Contractors Electrical Works Engineering Procurement and Construction (EPC) Engineering Procurement and Construction Management (EPCM) General Mechanical Works Pipe Lines Installations Steel Works

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.